Bitmain Antminer S21+ Hydro 319T 338T 358T 395T 15J/T Bitcoin Miner Hydro Cooling
The Antminer S21+ Hydro from Bitmain mines the SHA-256 algorithm with a maximum hashrate of 319/338T/358/395Th and energy efficiency of 15J/Th.
With rapid market changes, miner prices can vary frequently, even within a short time. Kindly verify the latest price with our sales team before making your payment.
$2,435.00
Punkhash now offers U.S. customers access to domestic inventory and DDP (Delivered Duty Paid) shipping services. For more details, please contact our sales team.
Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.
Payment Method
Description
Antminer S21+ Hydro Description
The Antminer S21+ Hydro is a high-performance Bitcoin mining machine designed for water-cooled operations, providing a powerful 319/358/395Th/s hashrate while consuming 4785W.
Antminer S21+ Hydro supports efficient Bitcoin mining using the SHA-256 algorithm and is compatible with the ANTRACK V1 hydro cooling cabinet, offering optimal temperature control for enhanced stability and performance.
Perfect for large-scale mining farms, Antminer S21+ Hydro delivers superior efficiency, making it a top choice for miners seeking to maximize their cryptocurrency mining potential with advanced hydro cooling technology.
Specifications
| Manufacturer | Bitmain |
| Model | Antminer S21+ Hyd |
| Release | Feb-25 |
| Size | 410 x 170 x 209mm |
| Noise level | 50db |
| Cooling | Hydro-cooling |
| Hashrate | 319/358/395Th |
| Efficiency | 15J/T |
| Voltage | 380-415V |
| Coolant Flow, L/min | 8.0~10.0 |
| Coolant pressure, bar | ≤3.5 |
| Coolant PH value | Antifreeze: 7.0~9.0 |
| Prue water: 6.5~7.5 | |
| Deionized water:8.5~9.5 | |
| Working coolant | Antifreeze/ Pure water/Deionized water |
| Interface | Ethernet |
| Temperature | 5 – 40 °C |
| Humidity | 10 – 90 % |
Specification
Overview
Processor
Display
RAM
Storage
Video Card
Connectivity
Features
Battery
General
Processing & Shipping Time
Payment Policies
Taxes & Custom Duties
Warranty & Buyer Protection
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
