Bitmain Anminer S19 XP Hyd. 257T 5345W SHA-256 Bitcoin Miner
Model Antminer S19 XP Hydro (257Th) from Bitmain mining SHA-256 algorithm with a maximum hashrate of 257Th/s for a power consumption of 5304W.
$1,199.00
Payment Method
Given the rapidly changing market, the prices of mining machines are subject to fluctuation; please confirm the latest pricing with our sales team before making a payment to avoid financial loss.
Not using WhatsApp? Leave a message and we'll get in touch
Description
Antminer S19 XP Hydro Description
The Antminer S19 XP Hyd is a new SHA-256 hardware that is even more powerful than the Antminer S19 Pro + Hyd introduced in January 2022. The Antminer S19 XP Hyd claims to produce an unbelievable 255 TH/s or 257 TH/s of processing power, much faster than any other miner available today.
The idea of creating Antminer was to invent the most powerful ASIC for bitcoin mining thanks to 7nm chips. After removing the coolers, the company decided to install hydrocooling, which had a positive effect on the performance of the miner.
Antminer S19 XP Hyd came out as the most powerful device available on the market, its frequency is amazing, and the payback period is attractive, the miner is reliable and will serve you for a long time.
Specifications
| Manufacturer | Bitmain |
| Model | Antminer S19 XP Hyd (257Th) |
| Also known as | Antminer S19 XP Hydro (257Th) |
| Release | Oct 2022 |
| Size | 410 x 170 x 209mm |
| Weight | 13100g |
| Noise level | 50db |
| Cooling | Water cooling |
| Fan(s) | 0 |
| Hashrate | 257Th |
| Power | 5345W |
| Voltage | 380-415V |
| Coolant Flow, L/min | 8.0~10.0 |
| Coolant pressure, bar | ≤3.5 |
| Coolant PH value | Antifreeze: 7.0~9.0 |
| Prue water: 6.5~7.5 | |
| Deionized water:8.5~9.5 | |
| Working coolant | Antifreeze/ Pure water/Deionized water |
| Interface | Ethernet |
| Temperature | 5 – 40°C |
| Humidity | 10 – 90 % |
About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.
