Bitmain Anminer S19 XP Hyd. 257T 5345W SHA-256 Bitcoin Miner

Model Antminer S19 XP Hydro (257Th) from Bitmain mining SHA-256 algorithm with a maximum hashrate of 257Th/s for a power consumption of 5304W.

With rapid market changes, miner prices can vary frequently, even within a short time. Kindly verify the latest price with our sales team before making your payment.

$1,199.00

Punkhash now offers U.S. customers access to domestic inventory and DDP (Delivered Duty Paid) shipping services. For more details, please contact our sales team.

Order 2 or more machines to save on shipping costs! Contact our sales team now to secure the best rates.

Payment Method

Gemini_Generated_Image_30c1rt30c1rt30c1

Description

Antminer S19 XP Hydro Description

The Antminer S19 XP Hyd is a new SHA-256 hardware that is even more powerful than the Antminer S19 Pro + Hyd introduced in January 2022. The Antminer S19 XP Hyd claims to produce an unbelievable 255 TH/s or 257 TH/s of processing power, much faster than any other miner available today.

The idea of creating Antminer was to invent the most powerful ASIC for bitcoin mining thanks to 7nm chips. After removing the coolers, the company decided to install hydrocooling, which had a positive effect on the performance of the miner.

Antminer S19 XP Hyd came out as the most powerful device available on the market, its frequency is amazing, and the payback period is attractive, the miner is reliable and will serve you for a long time.

Specifications

Manufacturer Bitmain
Model Antminer S19 XP Hyd (257Th)
Also known as Antminer S19 XP Hydro (257Th)
Release Oct 2022
Size 410 x 170 x 209mm
Weight 13100g
Noise level 50db
Cooling Water cooling
Fan(s) 0
Hashrate 257Th
Power 5345W
Voltage 380-415V
Coolant Flow, L/min 8.0~10.0
Coolant pressure, bar ≤3.5
Coolant PH value Antifreeze: 7.0~9.0
Prue water: 6.5~7.5
Deionized water:8.5~9.5
Working coolant Antifreeze/ Pure water/Deionized water
Interface Ethernet
Temperature 5 – 40°C
Humidity 10 – 90 %

Specification

Overview

Processor

Display

RAM

Storage

Video Card

Connectivity

Features

Battery

General

  • Processing & Shipping Time
  •  
  • Payment Policies
  •  
  • Taxes & Custom Duties
  •  
  • Warranty & Buyer Protection

 

In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.

Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.

Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.

International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.

*All sales are final and non-refundable. Please understand, this is an industry standard.