MicroBT WhatsMiner M63S++ 424Th/s 6572W Bitcoin Miner Hydro Cooling
Apple Shopping Event
Hurry and get discounts on all Apple devices up to 20%
Sale_coupon_15
$10,520.00
-
Pick up from the Woodmart Store
To pick up today
Free
-
Courier delivery
Our courier will deliver to the specified address
2-3 Days
Free
-
DHL Courier delivery
DHL courier will deliver to the specified address
2-3 Days
Free
-
Warranty 1 year
-
Free 30-Day returns
Payment Methods:
Description
WhatsMiner M63S++ – High-Performance Hydro-Cooled Bitcoin Miner for Large-Scale Crypto Mining
The WhatsMiner M63S++ is a next-generation hydro-cooled ASIC miner from the powerful M6XS++ series, engineered for Bitcoin (BTC) mining using the SHA-256 algorithm.
With an impressive hashrate of up to 478 TH/s and power efficiency of 15.5 J/TH, this high-end bitcoin machine is designed to meet the demands of industrial-scale crypto mining operations.
Featuring advanced hydro cooling technology, the WhatsMiner M63S++ ensures superior heat dissipation and system stability, even in intense operating environments.
Its optimized design helps bitcoin miners reduce energy costs while maintaining maximum mining performance.
Whether you’re scaling a mining farm or upgrading your current setup, the M63S++ delivers a reliable and efficient solution for mining bitcoin at scale.
With its cutting-edge technology and powerful performance, it’s a top choice for professionals looking to dominate the cryptocurrency mining landscape.
Specification
| Manufacturer | MicroBT |
| Model | WhatsMiner M63S++ |
| Release | Dec 2024 |
| Size | 483 x 663 x 86mm |
| Weight | 29500g |
| Cooling | Hydro cooling (1L) |
| Hashrate | 424Th/s |
| Power | 6572W |
| Interface | Ethernet |
| Temperature | 5 – 45 °C |
| Humidity | 5 – 95 % |
2. We always strive to ship as quickly as possible for all customers. After full payment confirmation, we ship via (DHLExpress/UPS/TNT). Bank wire transfers (T/T) take 3-7 business days, while cryptocurrency payment gateways take a few hours or up to 1 business day to verify the transaction.
3. International delivery typically takes 5-8 business days. More remote areas may take 8-10 days.
*All sales are final and non-refundable under any conditions.
Specification
Overview
Processor
Display
RAM
Storage
Video Card
Connectivity
Features
Battery
General
Processing & Shipping Time
Payment Policies
Taxes & Custom Duties
Warranty & Buyer Protection
Featured Reviews
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1-2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3-7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5-8 business days, with remote locations potentially requiring 8-10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
